Construction of Elazig Potable Water Project Hamzabey Dam And Related Facilities
| Name of the project | Construction of Elazig Potable Water Project Hamzabey Dam And Related Facilities |
|---|---|
| Location | Elazığ/Turkey |
| Project Owner | General Directorate of State Hydraulic Works, Region 9th |
| Contract Number | 2010/506215/16.11.2011 |
| Scope of Work | Dam Boady : • Type : Sand+gravel filling with clay grains • Crest Length : 317,30 m • Thalveg Height : 65,00 m • Foundation Height : 69,50 m • Lake Area at max. Water Level : 2.676 km² • Lake Volume at max. Water Level : 56,65 hm³ • Body Filling Volume : 1.671.722 m³ • Abrasion Excavation : 513.000 m³ Spillway : • Type : Through spillway, uncontrolled • Capacity : 60,80 m³/sn • Channel Lenght : 162,88 m • Channel Width : 13,00 m. ˜8,50 m • Concrete Volume : 5.000 m³ • Excavation Volume : 40.000 m³ Derivation Tunnel : • Type : Horseshoe Section • Discharge Capacity : 46 m³/sn • Tunnel Daimeter (Excavation /Interior) : 4,30 /3,40 m • Tunnel Lenght : 368,82 m • Concrete Volume : 3760 m • Excavation : 10.000 m³ Deep Sluice : • Type : Horseshoe Section / Steel Pipe • Pipe Diameter / Length : ø 110 cm / 175 m • Danger Valve : ø 120 cm Butterfly Valve • Adjustment Valve : ø 120 cm Quadratic Sliding Source Coffer Dam : • Type : Rock filling with clay grains • Length : 13,50 m • Crest Length : 10,00 m • Body Volume : 30.000 m³ Relocation Road : • Road Width: 10 m • Road Length :11,5 km • Road Excavation - Filling Volume : 1.042.000 m³ |
- PROJECTS
- DOMESTIC COMPLETED PROJECTS
- Construction of Elazig Potable Water Project Hamzabey Dam And Related Facilities
- Construction of Medical Faculty Dean's Office
- Sivas Zara - Hafik Water Inlet Structure and Transfer Line Project
- Construction of Court of Appeals, Samsun/Turkey Project
- Edirne-Uzunköprü Waste Water Collector Line
- Construction of DELICE 1 HPS
- Çağlayancerit(Kahramanmaraş) Sewerage System Construction
- Construction of Firebreaks and Fire Roads of Akkuyu NPP
- Construction of Shooting Field and Concrete Platform
- Clarion Hotel & Suites
- Cumhuriyet University Sewerage System and İnfrastructure
- Çavuşçiftliği 3rd Part Permanent Residences and Technical Infrastructure Facility
- Erzincan Jail, Erzincan/Turkey
- Erzincan Dormitory Building For 500 Persons
- Sivas Pusat Ozen Watering Part 1
- Public Housing For University Of Sinop
- Construction of Administration and Control Facilities and Sewage System
- Erzurum Palandöken 816 housing units
- Construction of Sinop Police Department Building
- Housing Development Administration of Nigde
- Construction of Aksaray Government Building
- Construction of Tank Testing Plant Road
- Eryaman (Ankara) Elementary School Construction
- Construction of Korfez (Kocaeli) Infrastructure Works
- Bolu Housing Complex
- Construction of Sakarya – Sapanca – Beskopru–Abali Temporary Residence Prefabric
- Construction of Access Roads of Kılıçkaya and Çamlıgöze Dams
- Enez (Edirne) Wastewater Treatment Plant
- Erzincan Univesity Dining Hall and Social Facilities Building
- Construction of Denizli Çal-Bayıralan Pond and Irrigation System
- Construction of Çavuşçiftliği (Yalova) City Roads
- DOMESTIC ONGOING PROJECTS
- INTERNATIONAL COMPLETED PROJECTS
- INTERNATIONAL ONGOING PROJECTS
- DOMESTIC COMPLETED PROJECTS