Name of the project Çavuşçiftliği (Yalova) 3rd Part Permanent Residences and Technical Infrastructure Facility Costruction & Yalova,Turkey
Location Cavusciftigi (Yalova) Turkey
Project Owner Ilbank Turkey
Contract Number
Scope of Work • 12 km Road Costruction.
• 21.5 km Sewerage Network.
• 4.6 km Collector Lines.
• 1.800 m3 Water Tank.
• 2 Pump Stations.
• 30.4 km Water Network.
• 3.5 km Storm Water Network.
• 17.5 km Heating Network.
• 1.5 km Drainage Lines.
• 17.900 m3 Retaining Wall.
• 68.000 m2 Landscape Work.
• 8 400 - 1000 KVA Transformer Station.
• 8.5 km MV Transmission Lines.
• 75 km MV - LV Electrical Network.