Çavuşçiftliği 3rd Part Permanent Residences and Technical Infrastructure Facility
| Name of the project | Çavuşçiftliği (Yalova) 3rd Part Permanent Residences and Technical Infrastructure Facility Costruction & Yalova,Turkey |
|---|---|
| Location | Cavusciftigi (Yalova) Turkey |
| Project Owner | Ilbank Turkey |
| Contract Number | |
| Scope of Work | • 12 km Road Costruction. • 21.5 km Sewerage Network. • 4.6 km Collector Lines. • 1.800 m3 Water Tank. • 2 Pump Stations. • 30.4 km Water Network. • 3.5 km Storm Water Network. • 17.5 km Heating Network. • 1.5 km Drainage Lines. • 17.900 m3 Retaining Wall. • 68.000 m2 Landscape Work. • 8 400 - 1000 KVA Transformer Station. • 8.5 km MV Transmission Lines. • 75 km MV - LV Electrical Network. • Road Leading for 4000 housing area. |
- PROJECTS
- DOMESTIC COMPLETED PROJECTS
- Construction of Elazig Potable Water Project Hamzabey Dam And Related Facilities
- Construction of Medical Faculty Dean's Office
- Sivas Zara - Hafik Water Inlet Structure and Transfer Line Project
- Construction of Court of Appeals, Samsun/Turkey Project
- Edirne-Uzunköprü Waste Water Collector Line
- Construction of DELICE 1 HPS
- Çağlayancerit(Kahramanmaraş) Sewerage System Construction
- Construction of Firebreaks and Fire Roads of Akkuyu NPP
- Construction of Shooting Field and Concrete Platform
- Clarion Hotel & Suites
- Cumhuriyet University Sewerage System and İnfrastructure
- Çavuşçiftliği 3rd Part Permanent Residences and Technical Infrastructure Facility
- Erzincan Jail, Erzincan/Turkey
- Erzincan Dormitory Building For 500 Persons
- Sivas Pusat Ozen Watering Part 1
- Public Housing For University Of Sinop
- Construction of Administration and Control Facilities and Sewage System
- Erzurum Palandöken 816 housing units
- Construction of Sinop Police Department Building
- Housing Development Administration of Nigde
- Construction of Aksaray Government Building
- Construction of Tank Testing Plant Road
- Eryaman (Ankara) Elementary School Construction
- Construction of Korfez (Kocaeli) Infrastructure Works
- Bolu Housing Complex
- Construction of Sakarya – Sapanca – Beskopru–Abali Temporary Residence Prefabric
- Construction of Access Roads of Kılıçkaya and Çamlıgöze Dams
- Enez (Edirne) Wastewater Treatment Plant
- Erzincan Univesity Dining Hall and Social Facilities Building
- Construction of Denizli Çal-Bayıralan Pond and Irrigation System
- Construction of Çavuşçiftliği (Yalova) City Roads
- DOMESTIC ONGOING PROJECTS
- INTERNATIONAL COMPLETED PROJECTS
- INTERNATIONAL ONGOING PROJECTS
- DOMESTIC COMPLETED PROJECTS