Supplying, Implementing Storm Pipeline with Lifting Station for 4th Stage of Mosul

Supplying, Implementing Storm Pipeline with Lifting Station for 4th Stage of Mosul
Supplying, Implementing Storm Pipeline with Lifting Station for 4th Stage of Mosul
Supplying, Implementing Storm Pipeline with Lifting Station for 4th Stage of Mosul
Name of the project Supplying, Implementing Storm Pipeline with Lifting Station for 4th Stage of Mosul
Location Mosul / Iraq
Project Owner Republic of Iraq Ministry of Municipalities and Public Works General Directorate of Sewerage
Contract Number 2/2014
Scope of Work

• Survey (checking locations)
• Site & Surface Cleaning
• Rubber Removal
• Design
• As-built Drawings
• Mobilization and Demobilization
• Excavation & Compaction
• Boulder
• Lean Concrete
• Foundation Works for 4825 meters length of Box Culvert
• Wall & Slab Works 4825 meters length of Box Culvert
• Bitumen Application
• Backfilling
• Manhole Construction Works
• Ramp Construction Works
• Supplying & Laying of 7985 meters length of GRP Pipes
• Supplying & Laying of 30 meters length of UPVC Pipes
• Supplying & Laying of 256 meters length of PVC Pipes
• Supplying & Laying of 7582 meters length of Reinforced Concrete Pipes
• Testing & Commissioning of Pipes
• Pump Station Building Works
• Power House Works
• Operation Room Works
• Mechanical Works
• Electrical Works