Scope of Work

• Mobilization

• Demolition and Site Cleaning

• Excavation, Rock Breaking, Backfilling,Compaction and Disposal

• Formwork and Reinforcement and Anchor Bolts

• Concrete Works

• Fence

• Gates

• Cement Concrete Hollow Blocks

• PVC Conduits

• Water Stop

• Transformers Yard

• Manhole Covers

• Leak Detection Pits for Storage Tanks

• Joints and Joint Filler

• Geotextile Membrane

• HDPE Pipes for Ductbanks

• Guard Rail

• Jersey Barrier

• Bollards

• Concrete Curb

• Gatch Road

• Erosion Control

• Construction of Stormwater Drainage System

• Safety Signages

• Precast Concrete Tiles

• Construction of Main Electrical Substation Building Including Screeding. Tiling.U/G Cabling,

   Sanitation, Doors, Windows & Fixtures, Roofing, Internal & External Painting, Railing,HVAC Etc.

• Construction of Central Control Building Including Screeding. Tiling. U/G Cabling, Sanitation,  

   Doors, Windows & Fixtures, Raised Access Flooring, Roofing, Internal & External Painting,  

   Railing, HVAC Etc.

• Construction of Laboratory

• Auger Drilling

• Asphalt Road