Name of the project Salah Ad Din Explosive Ordnance Disposal (EOD) Provincial Operations Center (POC)
Location Salah Ad Din / IRAQ
Project Owner US Army Corps of Engineers
Contract Number W917BE-08-C-0100
Scope of Work "Design & Built"
• Explosive Ordnance Disposal Provincial Operations Center.
• 4500 m2 Construction Area.
• 762.50 m3 Excavation.
• Perimeter CMU Wall
• 2 Guard Shocks.
• Power Plant
• 2000 m2 Asphalt Park Area.
• 100 m2 Official Car Park
• 165 m Asphalt Access Road, 5 m Wide.
• Water Distribution and Waste Water Collection
• ( 25 m and 125 m )
• HVAC System
• 60 m3 Fire Protection Water Tank
• 20 m3 Water Tank