Dernah Wind Farm Project (60 MW) Dernah /LIBYA

Dernah Wind Farm Project (60 MW) Dernah /LIBYA
Dernah Wind Farm Project (60 MW) Dernah /LIBYA
Name of the project Dernah Wind Farm Project (60 MW) Dernah /LIBYA
Location Dernah /LIBYA
Project Owner PEWCO (Public Electrical Works Company)
Contract Number 2009/1
Scope of Work • 65.000 m3 Excavation For 37 ea turbine, 50.000 m3 Backfilling.
• 9 km service road, 145.000 m3 Excavation, 84 m3 Backfilling.
• 11.400 m3 Concrete for 37 ea turbine, 800 tone Construction rebar.
• 6000 m3 Excavation and 6000 m3 Backfilling for storage yard.
• 540 m² workshop buiding