Iraq Army 2-2-2 Facilities Expansion

Iraq Army 2-2-2 Facilities Expansion
Iraq Army 2-2-2 Facilities Expansion
Name of the project Iraq Army 2-2-2 Facilities Expansion
Location FOB Diamondback - Mosul , Ninewa Governate, IRAQ
Project Owner US Army Corps of Engineers
Contract Number W917BE-06-C-0004
Scope of Work Design & Built:
• Grading, crushed stone, retention pond.
• 3x432 m2 Barrack buildings.
• 3x53 m2 Latriners buildings.
• 2x37 m2 Shower buildings.
• 423 m2 Kitchen / DFAC buildings.
• 236 m2 Troop medical cilinic.
• 522 m2 Administration building.
• Water supply system (150.000 liter water tank and
piping to all buildings).
• Septic tank.
• Electrical system (750KVA generator,distribution panels).
• Fuel system (20.000 liter fuel tank). Force protection (2 new
guard towers, 2 renovation of existing 2 guard towers, 75
light poles, barbed wire on existing walls).